01

Tell us what you run

The assessment walks you through property type, appliances, how long you need to run without the grid, and what you currently spend on fuel. You see the recommendation before we ask for your name.

Ten minutes, online
02

We call to book the inspection

An engineer calls to confirm what you entered and agree a visit. Nothing is charged and nothing is ordered at this stage.

Within one working day
03

Site inspection

We measure the real load at the board, assess the roof or ground area, check cable runs and shading, and confirm where the batteries and inverter will live.

Free, about two hours
04

Fixed quote

You get a single figure, a component list with brands and warranties, and a payment schedule. The figure does not move after this point unless you change the scope.

Within two working days
05

Installation and commissioning

Mounting, DC and AC wiring, protection devices, and full commissioning with you present. We hand over the as-built drawing and register every warranty in your name.

One to three days for most homes
06

Aftercare

Workmanship faults are ours to fix. Components carry manufacturer cover we registered for you. Call the same number you called at the start.

Ongoing